Build Analytics & AI.
With Barn Owl, your AI build engineer.
Barn Owl is Hermetiq's AI Agent that optimizes your Bazel and Buildbarn builds. Keep your existing infrastructure, or use ours.
You can use Barn Owl directly in Hermetiq, or give your own AI agent access to Barn Owl via MCP.
Discuss your deployment →Barn Owl helps you:
Find and fix build bottlenecks—even with remote execution
Pinpoint what changed when builds get slower
Understand cache misses and stop rebuilding the same work
Find out why builds are queueing and workers are idle
Diagnose intermittent remote build failures
Improve your Buildbarn configuration with reviewable changes
Identify wasted infrastructure capacity and reduce build costs
Earns its place in your stack.
It reads the build graph before its first coffee. Because it doesn’t drink coffee. Because it’s an owl.
Wide awake.
Cache hit-rate erosion. A widening critical path. A worker pool quietly burning budget. Barn Owl watches the signals in your stack around the clock.
Knows your build.
Fluent in Bazel and Buildbarn. It connects actions, cache events, queues, workers, and configuration to explain what changed and why.
Earns your trust.
Explanations first. Recommendations next. Then fixes as PRs you review and merge. More autonomy only where you grant it—never the keys to prod by default.
Gets wiser.
Every build outcome is another lesson in your stack’s failure modes. The owl learns what actually worked, not just what sounded plausible.
Build expertise. Context included.
Barn Owl combines Hermetiq’s tools and data with purpose-built prompts, model routing, and context from your builds, remote execution environment, and configuration. It brings that expertise into the part of Hermetiq where you’re working.
- AI diagnosis of build failures and cache misses
- Queue, worker and storage investigation
- Reviewable build and infrastructure fixes
- Build performance and capacity optimization
The data behind your build analytics.
Connect what happened in a build to the actions, cache, and infrastructure behind it.
Bazel build data
- Build Event Protocol (BEP)
Builds, targets, tests, failures, and configuration events.
- JSON trace profiles
Build phases, action timing, parallelism, and resource counters.
Buildbarn action and cache data
- Action Cache lookup events
Cache hits and misses, linked to the actions behind them.
- Completed-action logs
Remote execution timing, results, and action resource usage.
- Content Addressable Storage (CAS)
Commands, inputs, environments, and platform details that explain cache behavior.
Infrastructure telemetry and costs
- Metrics via VictoriaMetrics
Buildbarn and Kubernetes performance and health signals.
- Logs and events via VictoriaLogs
Pod logs and Kubernetes events for operational diagnosis.
- Kubernetes API
Worker pools, workload configuration, replicas, and autoscaling state.
- OpenCost
Infrastructure costs and resource allocation data.
Available analytics depend on the data sources connected to your deployment.
See how each data source connects →The same Barn Owl, focused on your configuration.
Work with an agent that understands your open configuration, uses specialized Buildbarn prompts, and selects models based on your question.
BB Config Editor
Inspect, edit, render, and validate your Buildbarn configuration. Work with Git-backed ConfigSets, import and export ConfigMaps, and review validation errors alongside your source.
Barn Owl
Ask questions about that configuration, investigate problems, and review proposed changes. Connect telemetry so its recommendations can draw on your running environment.
Start with your configuration. Connect live telemetry for deeper diagnosis. Barn Owl can explain the files you load before telemetry is connected; understanding live worker, queue, and storage behavior requires the relevant signals from your deployment.
Ask your config anything.
Get answers grounded in the ConfigSet you load, with the context to understand how your configuration fits together.
Fixes proven before you see them.
Barn Owl finds the file that broke your render and proposes a repair that already renders and validates. You review. You apply.
A storage audit that knows the pitfalls.
Block geometry, spare blocks, key-location maps, hardcoded namespaces. Every finding cites the file and path so you can see exactly what needs attention.
Recommendations backed by measurements.
Connect storage, scheduler, and worker telemetry to guide recommendations with measurements from your environment.
Diagnose idle workers in seconds.
A platform mismatch, a capacity ceiling, or an empty queue? Barn Owl tells you which so you can take the right next step.
Security rollouts, planned for you.
Plan OAuth2 and mutual TLS across every Buildbarn service, with validated proposals and a clear view of the ports that must stay open.
The context to diagnose. The tools to fix.
Buildbarn Config Editor + AI Assistant
Stop hunting through repos for the right proto field. Ask an AI assistant that has indexed Buildbarn’s protobuf schemas, then edit configuration in forms generated from those same schemas.
Changes are saved as git commits, with optional PR review—so your team can see what changed, who changed it, and review it before deployment.
Your build context. In your coding agent.
Hermetiq’s MCP integration gives compatible coding agents access to your build evidence. Bring failures, cache misses, and execution context into the workflow where you already write code.
Explore MCP for Bazel →Choose where it runs.
Use Hermetiq Cloud or deploy in your private cloud or data center.
Cloud
Analyze your Bazel build data with analytics and Barn Owl AI. Keep your existing infrastructure.
- Who operates your infrastructure?
- You keep and operate your existing build infrastructure
- Where Hermetiq runs
- Hermetiq Cloud
Connect Bazel build events to Hermetiq. Add available cache, action, and infrastructure telemetry from Buildbarn for deeper analysis.
Setup guideOn-prem
Analyze your Bazel build data with analytics and Barn Owl AI. Keep your existing infrastructure.
- Who operates your infrastructure?
- You keep and operate your existing build infrastructure
- Where Hermetiq runs
- Your private cloud or data center
Connect Bazel build events to Hermetiq. Add available cache, action, and infrastructure telemetry from Buildbarn for deeper analysis.
Setup guideBuild Analytics & AI is a complete offering and is also included with Managed Cache & Execution. Barn Owl is the AI build engineer inside Hermetiq. It watches your connected telemetry, explains what changed, and proposes fixes as PRs you review and merge. It learns from build outcomes and earns more autonomy only where you grant it. Hermetiq’s MCP integration also brings build context into your existing coding agents.
Plan your deployment.
Talk through your platforms, infrastructure and build goals with us.
Contact Jake for pricing (Jake@Hermetiq.com)
Let the owl take the night shift.
Connect your deployment to Hermetiq Cloud, or install intelligence in your own environment.
Technical review: July 20, 2026 · Verify configuration details against the Bazel and Buildbarn versions deployed in your environment.